Quote & Contact Phone (03) 5444 0148
The Truss Joint
  • Home
  • About
  • Products
  • Project Gallery
  • Instagram Gallery
  • Obtain a Quote
  • News
  • Contact
  • Search
  • Menu Menu
  • Instagram
  • Pinterest
  • Facebook
  • Mail

PRD Offices – Bendigo

Glulam Beam Stairs
Timber Beams
GL18 Vic Ash
Glulam Bearer
Glulam Floor Beam

Our structural timber beam, design and supply services were called upon to help achieve a rustic upmarket refurbish of the new PRD offices in Bendigo, Victoria.

Working with Peter and his client from concept design stage they had a clear vision and goal in mind. Paying homage to the buildings original use as a Red Wheel Coach Factory by Frederick Bruechert. The original hand painted signage and brickwork were retained and featured throughout.

We were engaged to design and supply new GL18 VicASH Glulam floor bearers which were capable of carrying office/commercial loads. In keeping with the clients theme while we were designing the fixings, we offered to carry the Bruechert name into the fabrication steel work. The result was perfect and had the desired effect of tying in with the rest of the rebuild.

The beams were finished in a natural oil with all fabricated steel being provided powder coat black.

The end result is a credit to Peter and his crew.

See below for an in depth video from the PRD Facebook page.

Project Video:https://www.facebook.com/PRDbendigo/videos/the-showroom-158-lyttleton-terrace-bendigo/711457357017715/

Date

July 2024

Client

Peter Brown Custom Homes

Categories

  • Engineered Timber Beams
Share
  • Facebook
  • Mail
Clare / Sedgwick
PGB / Sedgwick

Related Items

  • Zoom

    Rural Retreat Trusses

    Engineered Timber BeamsPrefabricated Roof Trusses

Quick Links

  • The Truss Joint Products
  • Get in Touch
  • Quote Enquiry

Factory & Office Location

12 Hesling Court
East Bendigo, Victoria, 3550

(03) 5444 0148
enquiry@thetrussjoint.com.au

Factory & Office Hours

Mon-Fri: 6:00am-3:45pm
Sat/Sun: Closed

Archive

  • April 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
© Copyright - The Truss Joint - Site by GT
  • Instagram
  • Pinterest
  • Facebook
  • Mail
  • Privacy Policy
Clare / SedgwickJNC BuildingConcealed Screwed JointPGB / Sedgwick
Scroll to top